Gentlemen, Thank you very much for your interest in our company. We are pleased to introduce our companies. Our company was founded in SEPTEMBER 1977 in Gevelsberg, Germany, as an ENGINEERING OFFICE specializing in MATERIALS HANDLING EQUIPMENT AND SYSTEMS. |
||||||||||||||||||||||||||||||||||
SEMI MOBILE CRUSHING STATION IN THREE PARTS: - ACCESS BRIDGE - STORAGE BIN WITH APRON CONVEYOR - CRUSHER PLANT |
||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||
MATERIAL HANDLED: LIGNITE HANDLING RATE: FEED MATERIAL SIZE: £ 1500 / 1500 / 1500 MM |
||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||
COMPLETED FOR EGAT LIGNITE CORPORATION THAILAND
|
||||||||||||||||||||||||||||||||||
From small beginnings our engineering consultancy has grown into a successful company. Contracts have been completed world wide in consulting, project managing and design engineering. | ||||||||||||||||||||||||||||||||||
RADIAL STACKER FOR COAL HANDLING RATE: 800 t/h BELT WIDTH: 1000 mm BELT SPEED: 3 m/s SLEWING SPEED: 30 m/min BOOM LENGTH: 61 m COMPLETED FOR ARCH MINERALS (USA) |
![]() |
|||||||||||||||||||||||||||||||||
FLOATING DREDGER FOR CHALK HANDLING RATE 200 t/h TOTAL POWER 430 kW COMPLETED FOR A CHALK PIT HANNOVER / GERMANY |
![]() |
|||||||||||||||||||||||||||||||||
PREPARATION PLANT FOR COAL WITH - CRUSHERS - SCREENS - SAMPLE EXTRACTION UNITS - CONVEYOR BELTS - APRON CONVEYORS - WEIGHING STATION - STEEL CONSTRUCTION - CONTROL ENGINEERING - PREPARATION RATE: 1000 t/h |
![]() |
|||||||||||||||||||||||||||||||||
COMPLETED FOR A COAL PREPARATION PLANT (USA) |
||||||||||||||||||||||||||||||||||
STACKER - RECLAIMER FOR COAL HANDLING RATE: 3000 t/h BUCKET WHEEL DIA: 8 m BOOM LENGTH : 50 m TOTAL POWER 600 kW BELT WIDTH 1400 mm COMPLETED FOR STOCATRA BELGIUM |
![]() |
|||||||||||||||||||||||||||||||||
Based on our experience in bulk material handling, our second company, LINGENBERG, HANDEL UND VERWALTUNG, was founded as a specialized enterprise working in the steadily expanding field of environment protection. Many proprietary products were developed to meet market requirements. For years they have operated reliably and satisfactorily around the clock throughout the world, in particular:
|
||||||||||||||||||||||||||||||||||
„ECS“ BY LINGENBERG - THE LAST WORD IN DUST SUPPRESSION TECHNOLOGY | ||||||||||||||||||||||||||||||||||
![]() |
![]() |
|||||||||||||||||||||||||||||||||
![]() |
TRUCK LOADING STATION FOR BASALT SIEVE FRACTION 0 - 2 mm HANDLING RATE: 350 t/h COMPLETED FOR VOGELSBERGER HARTSTEIN INDUSTRIE D - BÜDINGEN |
![]() |
SHIPLOADER FOR LIMESTONE
SIEVE FRACTION: 0 - 32 mm HANDLING RATE: 2.500 t/h COMPLETED FOR RAK ROCK COMPANY RAS AL KHAIMAH - UAE |
|||||||||||||||||||||||||||||||
![]() |
![]() |
|||||||||||||||||||||||||||||||||
In 1994, LINGENBERG Con____Trad____Eng started as a world wide enterprise in Consulting, Trading and Engineering,- combining the capabilities of the engineering office and LHuV with other specialized companies to manage complete industrial systems with full service from one source, including |
||||||||||||||||||||||||||||||||||
Consulting and complete design engineering Manufacturing and field erection Reliable after sales service |
||||||||||||||||||||||||||||||||||
To meet the expanding requirements of our customers, a partnership was formed in 1985 with KEMPER + ERWIN ENGINEERING GmbH in Mönchengladbach / Germany | ||||||||||||||||||||||||||||||||||
Our qualified engineering enables us to achieve high standards in | ||||||||||||||||||||||||||||||||||
consulting project engineering conceptional studies optimizing concepts basic engineering dynamical and statical calculation detail engineering and project management |
![]() |
|||||||||||||||||||||||||||||||||
COAL STACKER HANDLING RATE: 450 t/h MELLACH POWER STATION GRAZ / AUSTRIA |
||||||||||||||||||||||||||||||||||
Our areas are | ||||||||||||||||||||||||||||||||||
- preparation plants - bulk material handling - port facilities - cargo handling for bulk material - mining - power stations - recycling plants for all kinds of rubble, debris and waste - compostation plants - forestry facilities - control engineering - process engineering
- pipe systems - civil engineering |
![]() |
|||||||||||||||||||||||||||||||||
EXHAUST AIR SHIPUNLOADER FOR GRAIN SAUDI - ARABIA |
||||||||||||||||||||||||||||||||||
Our engineering staff has redesigned many antiquated pieces of mechanical equipment to make modern high performance components, resulting in:
State of the art computer systems and programs optimize our engineering capabilities. |
||||||||||||||||||||||||||||||||||
PROJECT IMPLEMENTATION | ||||||||||||||||||||||||||||||||||
our worldwide tried and tested experience in project implementation is - in general - as follows:
|
||||||||||||||||||||||||||||||||||
THESE PROCEEDINGS PROVIDE SIGNIFICANT ADVANTAGES FOR THE CLIENT | ||||||||||||||||||||||||||||||||||
SUCH AS: | ||||||||||||||||||||||||||||||||||
- materials purchasing and - manufacturing of the equipment - both as far as possible in the clients country |
||||||||||||||||||||||||||||||||||
saving | creating | |||||||||||||||||||||||||||||||||
- shipping charges - import duties and - cargo handling charges - LC - charges - expenses in the suppliers country |
- local business, both labour and material - familiarity of the staff with locally manufactured equipment |
|||||||||||||||||||||||||||||||||
and simplifying
|
||||||||||||||||||||||||||||||||||
- procurement of spares and consumable goods | ||||||||||||||||||||||||||||||||||
Commissioning will be executed in cooperation with clients staff - enabling the staff to be fully familiar with the complete installation and operation. Our engineers are at your service - worldwide - for consultation on all phases of project implementation and also for the supervision of manufacturing and erection. For more information please contact our head offices or our branch offices |
||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||