- GCC-GULF CEMENT COMPANY(P.S.C.)
- P.O. BOX 5295
- RAS AL KHAIMAH
- UNITED ARAB EMIRATES
TEL.: |
00971-7-266 8 222
|
FAX.: |
- 00971-7-266 8 038
|
-
|
Prevention of dust emissions in a handling and processing area where alternately BAUXITE, SILICA and LIMESTONE are transported. |
|
|
All materials to be handled will pass crushing and screening units before being stockpiled.
Handling capacity is 250 tons per hour, the feed granularity 0 - 12 mm contains 20 % of fines.
|
|
|
|
|
|
|
The photos show the stockpiling of LIMESTONE with and without the use of an active ECS dust suppression system. |
|
The maximum delivery capacity of the ECS installation is 2000 litres per hour |
The actual quantity of service fluids used is: |
power drain |
|
725 |
litres of water per hour |
|
0,18 |
litres of tenside per hour |
|
2,2 |
kw |
|
|
|
Assuming a handling capacity of 250 tons per hour the additional humidity in the Material is 0.29% |
|
|
The proportion of dust still remaining in the surrounding air is £ 30mg/m³ |