CHECK LIST FOR DUST SUPPRESSION SYSTEM

TECHNICAL INFORMATION

- FILL OUT AS ACCURATELY AS POSSIBLE -

CUSTOMER:
ADDRESS:
CUSTOMERS PROJECT IDENTIFICATION:
CONTACT PERSON EXTENSION:
CONTACT PERSON EXTENSION:
TEL.:
FAX:
E-MAIL:

TYPE OF MATERIAL CONSIDERED: (coal, limestone, bauxite, clinker ...)
BULK DENSITY: t/m³
FACTOR OF LOOSENING:
SOLID MATERIAL CRUSHED MATERIAL
NATURAL INHERENT HUMIDITY: %
TOTAL INHERENT HUMIDITY AFTER APPLICATION OF ECS SHOULD NOT EXCEED: %
FLOW SHEET / KIND OF MATERIAL
REMARK:

We require the best possible knowledge about the consistency of the material in order to be able to offer you the most effective system. Therefore we request a list of the specific weight, the handling rate and the granularity concerned for each stage of processing.

If you want us to analyse these data please send a sample of 2kg of each granularity.

- please attache flow sheet showing in detail: -
PRIMARY SCREEN: feeding rate t/h feed material size £ mm
screen deck A oversize £ mm Þ % of feeding rate
screen deck B oversize £ mm Þ % of feeding rate
screen deck C oversize £ mm Þ % of feeding rate
underzize £ mm Þ % of feeding rate
SECONDARY SCREEN: feeding rate t/h feed material size £ mm
screen deck A oversize £ mm Þ % of feeding rate
screen deck B oversize £ mm Þ % of feeding rate
screen deck C oversize £ mm Þ % of feeding rate
underzize £ mm Þ % of feeding rate
TERTIARY SCREEN: feeding rate t/h feed material size £ mm
screen deck A oversize £ mm Þ % of feeding rate
screen deck B oversize £ mm Þ % of feeding rate
screen deck C oversize £ mm Þ % of feeding rate
underzize £ mm Þ % of feeding rate
CRUSHERS:
type of crusher
feeding rate
feed material size
crushed size
t/h
mm
mm
A
B
C
- plant dimensions: measurements of length and height between different points where i.e. materials change direction and / or speed (necessary to determine supply lines for water and cable)
CLIMATIC CONDITIONS
range of temperature: minimum °C maximum °C
wind speed average m/s max m/s
COMPLETE EQUIPMENT TO BE WINTERIZED: NO
YES: DOWN TO MINUS °C
FRESH WATER:
QUALITY: drinkable
rain
seawater
surface water
pit water
other
size of impurities: µm
content mass of impurities per liter: mg
raw water contains sulphur: yes / no
MAIN VOLTAGE: V / Hz
voltage swing: related to nominal value + % / - %
desired gate voltage: V ( DC / AC)
FOLLOWING MATERIALS TO BE PROVIDED BY THE CLIENT ???
RUBBER HOSES INCL. ASSEMBLING MATERIAL
DESIGN FEATURES REQUIRED:
resistant against oil - sun crack - ozone - ultra violet
nominal pressure / bursting pressure: 16 bar / 50 bar
yes / no
PIPING INCL. ASSEMBLING MATERIAL - ACCORDING TO DIN 2440 -
DESIGN FEATURES:
zinc coated / suitable for threading
nominal pressure / bursting pressure: 16 bar / 50 bar
yes / no
CABLES INCL. ASSEMBLING MATERIAL
DESIGN FEATURES:
resistant against oil - sun crack - ozon - ultra violet- can be driven over
circuit voltage 500 V / test voltage 2000 V - PVS - isolation - lead identification
yes / no
SYSTEM OPERATING HOURS: daily
days per year
days per year below freezing point
CONTROLLING SYSTEM
ECS Dust suppression system can be equipped with a subportion control to bring it into line with changing operating conditions due to changing mass flow by alternating consumption of sprayed mixture.
SYSTEM TO BE INCLUDED IN OUR OFFER YES / NO
IF YES: OPERATED BY
HAND / AUTOMATIC
AUTOMATICALLY OPERATED TEGI SELF CONTROL SYSTEM
ECS - dust suppression system can be equipped with automatically operated self control system - saving cost for maintenance and checks.
System to be included in our proposal YES / NO
SYSTEM CONSIDERED INCLUDES DUMPING STATION: NO / YES
IF yes: TRUCK DUMPING GRAB DUMPING
WAGGON DUMPING OTHER
MAX. MASS PER DUMP CYCLE: tons
DUMPING TIME seconds
SHORTEST INTERVAL BETWEEN TWO SUCCESSIVE DUMPINGS seconds
OUTER DIMENSIONS OF RECEIVING HOPPER: (m) x (m) x (m)
ERECTION WORK:
buyer will provide staff for erection work without charge for supplier NO / YES
IF yes: pipe fitters
electricians
mechanics
helpers
STANDARDS AND REGULATIONS
ECS complies with the standards DIN / VDE / VDI. If special standards and regulations to be considered please specify and enclose copies of relevant chapters:
REMARKS:

CHECK LIST FOR DUST SUPPRESSION SYSTEM

COMMERCIAL INFORMATION

- FILL OUT AS ACCURATELY AS POSSIBLE -

GOODS SHALL BE SUPPLIED BY: AIR CARGO
SEA FREIGHT
TRUCK
TRAIN
DELIVERY TERMS EX WORKS
CFA
FOB
CFR
CIF
PACKAGING CONDITIONS SEAWORTHY
INTERNAL PACKAGING SUITABLE FOR MULTIPLE HANDLING AND FOR LONG LASTING STORAGE YES / NO
IF YES FOR MONTHS
KIND OF PACKAGING CONTAINER
WOODEN CHEST
REQUIRED DOCUMENTS CERTIFICATE OF ORIGIN

-confirmed by German Chamber of Commerce- and
LEGALIZED
-by
CERTIFICATE OF WEIGHT
PACKING LIST
OTHER DOCUMENTS - PLEASE SPECIFY
LEGALIZED
LEGALIZED
LEGALIZED
OTHER CONDITIONS - PLEASE SPECIFY -: